horuhe00
Civil/Environmental
- Nov 23, 2010
- 4
Hello.
I'm working in a project where we are building dikes with A-7-6 soil and I need to know the typical range for calculating "bank to loose", and "loose to compacted". Can I get that information from a soil test and which one?
I'm working in a project where we are building dikes with A-7-6 soil and I need to know the typical range for calculating "bank to loose", and "loose to compacted". Can I get that information from a soil test and which one?