tivester
Electrical
- Aug 22, 2007
- 13
Is there a requirement or guidline for performing a new coordination study/short circuit analysis when a facility's existing electrical system has had changes and additions made to it? While I assume it is best practice to do this, is there a section of the NEC, NFPA, or IEEE standard that specifically references this requirement? Thank you.