CPENG78
Civil/Environmental
- Sep 2, 2008
- 186
I have a private access road (driveway) serving 8 units that are to be a considerably lower in elevation than the frontage street. The city engineer has notified us to follow ASSHTO guidelines. Does ASSHTO require a vertical curve after a specific grade break? All of my quick research points to the ASSHTO greenbook but I dont have one in the office. I would put a vertical curve regardless but I would like to find out what is the minimum and what length. The slope from lip of gutter to back of walk is approximately 2% and then slope must drop as quickly as possible. I would like to maximinzse this at 15%, however it all depends on the required length of the curve and placement of the PVI. Vehicle speed to be between 5 to 10 mph. Any input greatly appreciated.