bnard
Civil/Environmental
- Oct 20, 2003
- 21
We have this 7,350 cu.m underground reservoir with a height of 8.80m wherein 6.0m are underground and 3.8m is above ground. The layout is somewhat trapezoidal in shape and a two chamber system is proposed for considering the maintenance. Is there a guidelines in locating and designing the vent opening seize for this type of reservoir? Any advise would be very helpful. Thanks