kennyb04
Structural
- Jun 17, 2011
- 33
I received pictures from one of our projects showing continuous trench footings being placed in water. The water is half way up the trench, rebar has already been places, and concrete is being placed in the trench as is. Can any one come up with a reference where this would not be allowed or is this common in areas with high water tables. I guess as the concrete is placed, it would push the water down the trench and out and would not mix much, if any, of the mixed concrete with the water in the trench. Any comments on this would be appreciated.