sukidovi
Industrial
- Nov 6, 2005
- 1
Hi, I have been assigned the thankless task of programming a single hoist chemical process line to accommodate a new nickel and gold plating chemistry. I need to design a loop which will manipulate the maximum possible number of baskets of work in such a way that each of them will complete the same series of timed movements. Is anyone able to give me ay advice please? I am able to easily understand the business of programming the hoist to carry out desired movements but I am a bit stumped with regard to designing an efficient loop or "timeway". Any assistance would be gratefully received.