kechha2060
Civil/Environmental
- Dec 8, 2007
- 26
A park with playgrounds (football, soccer, etc..) is being developed adjacent to the street I am designing. An intersection exists 1/4 mile ahead of the entrance to the park.. I am leaning towards a warrant study but my question is the traffic counts is for existing traffic and how would one project the future traffic? I am unable to obatin any design criteria from the people building the park.