prc
Electrical
- Aug 18, 2001
- 2,013
In power transformers, usually bushing current transformers ( both for protection and metering)are provided as back up. For convenience of testing it is usual to provide a one turn test winding in addition to the secondary winding. During service, test winding will be kept open with one end earthed.Is this a normal practice everywhere? In case more than one turn is provided for test winding is there any issue as the secondary will be always shorted through load.How much current rating is required for test winding?