MISA
Mechanical
- Nov 28, 2002
- 1
Our client want from us to analise tailings line CS(A 106 Gr.B) line 10" OD 1/2" rubber lined using Caesar II. Pipeline is 9 km long , heat traced and insulated in HDPE jacket. 3/4 Pipeline laying on the graveled ground. Pressure is 1,000 psi. Is anybody expirienced modeling line laying on the ground (constantly supported)? Any guidelince or advice?
Tx in advance.
Tx in advance.