sunilji
Electrical
- Feb 17, 2001
- 28
I need to know if it is possible to run a 180KVA DG set in parallel with a 500KVA DG set ( Synchronizing ). If yes what are the precautions to be taken for safe operation
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.