pianoman1
Mechanical
- Mar 14, 2007
- 37
I have a paper mill client that wants to replace about 750 feet of underground 3" steam piping with above-ground piping. One problem is that the structures he has available to hang pipe from are mostly 50 to 60 feet apart. I've been looking for either light pre-fab pipe bridges or some guidance on how to design a two-cable truss for under the piping, but can't find anything useful online. Anyone have any thoughts or references? I hate to add a bunch of posts in the client's woodyard.
Thanks in advance for any feedback.
Thanks in advance for any feedback.