Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations cowski on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Straight run requirements for a restriction orifice?

Status
Not open for further replies.

skuntz

Chemical
Mar 16, 2008
69
We are installing an RO to let down the pressure downstream of a control valve. Since we are only taking a pressure drop and not taking flow measurements, is it necessary to have straight run requirements?
 
Replies continue below

Recommended for you

skuntz,
No, if you are not measuring then you do not need any straight run.

Sometimes its possible to do all the right things and still get bad results
 
Status
Not open for further replies.

Part and Inventory Search

Sponsor