action
Structural
- Jul 18, 2001
- 6
After talking to other engineers involved in the design of structural steel connections, there seems to emerge a major problem involving approval of connections by the Engineer of Record. I know many connection design engineers who have been doing this work for years, but have problems with the EOR rejecting submissions. In some cases, it is due to a missing limit state, but in other cases it seems to be attributed to the design "preferences" of the EOR.
Anybody have suggestions on how to best minimize calculation rejections? Thanks