Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations cowski on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

steel concrete formwork to receive tiling

Status
Not open for further replies.

newbuilder

Structural
Jul 1, 1999
73
We have been working with steel formwork for concrete surfaces to receive tiling with a rendered background.

When comparing the strength of the render to steel formed concrete and timber formed concrete the latter is tops.

Is there any technique which can be used to improve the cohesiveness of the tiles to steel formed concrete? (Not including spatterdash). [sig][/sig]
 
Replies continue below

Recommended for you

This may be due to the higher w/c (water/cement) ratio remainded in the former material which can provide less strength development, and the latter privide quickly hardening and strength development.

Why not adjust the workable w/c ratio or use quick hardening cement or aluminium sulfated cement?

Any questions, please contact qinghan.bian@3web.net
 
Status
Not open for further replies.

Part and Inventory Search

Sponsor