I have several traps that are running in individual lines to a vented receiver tank. I would like to combine the discharge of the traps into a single line that goes into a new vented receiver tank.
The traps are all operating at varying upstream pressures..30psig, 175psig, 400psig, and 1250psig. I need some pointers on how to size the common line going to the new vented receiver.
I've found information on Sarco's website on how to account for flash steam in the condensate line from a single trap, but how do you account for several traps all operating at different pressures?