JBUDA54
Electrical
- Aug 7, 2001
- 110
I have a client that has requested that the low voltage Motor manufacturer provide bus terminations for 200HP LV Motors instead of using motor leads. Now they are concerned that the motor connections will require a space heater to remove condensation. I have never put space heaters in low voltage motor conduit boxes, but I haven't requested that bus connections be used either. Is this a waste of money or is there some merit to this request.