SHOOTZ
Civil/Environmental
- Nov 11, 2011
- 12
Am designing a concrete hardstand for stacking empty crates up to 3m high, the existing ground slope is about 3%, to minimize earthworks Am planning to design a floor with a maximum gradient of 2%. I read somewhere that allowable slope for hardstand is 1% which is costly to adopt. Is this safe to adopt 2% grade, Any suggestion is appreciated.