PEDARRIN2
Mechanical
- Oct 1, 2003
- 1,287
I have a project which is using digestor gas (~60% methane) to run a generator which is listed as being used for this gas. I have gas analysis so I know what the BTU/ft3 of the digestor gas.
I am responsible for sizing the piping to the generator.
I know how to size the piping if the gas is natural gas (~92% methane).
I have a general approach that I am comfortable will work but wanted to see if anybody has any actual experience with this.
I am responsible for sizing the piping to the generator.
I know how to size the piping if the gas is natural gas (~92% methane).
I have a general approach that I am comfortable will work but wanted to see if anybody has any actual experience with this.