bmerc
Civil/Environmental
- Oct 19, 2002
- 3
In preparing a subdivision proposal, I exclude sidewalks and leave it up to the P & Z or Eng. Dept. to tell me to put them in, that is because I cannot get a handle on the logic for using them or not? I've submitted Cul-De-Sacs and they have added them, I have thru road subdivision between collector roads and the projected volumes are high and no sidewalks are required. It's not good for my clients to always put them in and have to build them, but on the other hand it's RIGHT to put them in when they provide a level of safety which improves the subdivision and increases that development's chance of being successful.
Any thoughts or guides that will straighten out this matter for me???
Any thoughts or guides that will straighten out this matter for me???