Geotechnical76
Civil/Environmental
- Aug 22, 2003
- 36
I am designing a sheetpile where rock is 45 feet deep. The sheetpile is anchored at a certain distance from the top (above ground water table). The sheetpile analysis indicated that the pile should be extended beyond the soil/rock interface. What is the best practical method to install sheetpiles in rock? Thanks.