jjmoore73
Mechanical
- Apr 13, 2011
- 30
Attached is an apartment in a multi-family project. We have completed 100+ of these 2 story buildings over the years and this problem came up once 6 years ago and was resolved with the AHJ. It has not been a problem until this week when a sr. inspector said we needed to add a sprinkler head at the entry location. I do not know the details of the original agreement, and I cannot find a specific code to eliminate the sprinkler head. Each building has 16 - 24 units, right now it is the small 2 bedroom unit with the 29" soffit over the entry in question. Some units have a 6" soffit and other units have an 18" soffit. Is the 6" soffit ok? What about 12"? When does it become a problem? The only code I could think of to counter act was the shadow rule. Does anyone have any suggestions?
Adding 1 head does not seem like a big deal, but it will be almost one hundred heads on buildings in various stages of construction and many already have sheetrock installed, but not yet painted. Getting pipe to the sprinkler head is another challenge.