jaggars
Geotechnical
- Mar 2, 2006
- 21
I have a situation whereby i am designing a Segmental Retaining Wall is Ht:- 1.575m it is holding up 2H:1V slope above i have designed tie back of 1.3m (0.83 base to ht ratio). The slope runs about 5.8m and then it tapers to Rail track. I am asked to account for rail load Cooper E90. I drew a 10H : 7V from the rail track. It just touches the back of Geogrid behind the wall. The structural engineer of the client recommends i use 2H : 1V as load influence from the rail track. How should i account for this extra load. I if draw 2H : 1V slope line from rail track the load line is hitting the Facing system at almost mid of wall.
Thanks for all your suggestions.
Thanks for all your suggestions.