odlanor
Electrical
- Jun 28, 2009
- 689
ABB introduce a new standardized testing methodology for transformer differential protection relay , only using Secondary Injection current.
The standard three-phase power transformers introduce a fixed phase angle shift Θ of n*30º (n=0, 1, 2, …, 11)
My case is first connection type (i.e. both main CTs stared inside) and my stepup transformer is YNd1d1.
Is this connection type aplicable for 3 winding transformer?
reference:
SA2008-000355 rev. -Universal Testing Method for Power Transformer Differential Protection -
Secondary Injection for Transformer Differential Protection
The standard three-phase power transformers introduce a fixed phase angle shift Θ of n*30º (n=0, 1, 2, …, 11)
My case is first connection type (i.e. both main CTs stared inside) and my stepup transformer is YNd1d1.
Is this connection type aplicable for 3 winding transformer?
reference:
SA2008-000355 rev. -Universal Testing Method for Power Transformer Differential Protection -