Back in my first year of work, one of the senior engineers (who threatened to pummel me if I ever again pointed out that his BSME was dated 12 years before my DOB) said that the rule-of-thumb for a fastener to be sufficiently engaged was that 5 threads was considered full strength.
I'm wondering if anybody's heard this and could validate it.
Certainly in a critical application I'd take the time to calculate the thread loading.
I'm wondering if anybody's heard this and could validate it.
Certainly in a critical application I'd take the time to calculate the thread loading.