TypeIV
Structural
- Jun 28, 2004
- 27
I am designing a Through Girder RR Bridge for BNSF and I need help with the intermediate stiffener.
I am bolting a WT stiffener to the web for the intermediate stiffeners, but I can't find anything in the AREMA code to give me a criteria for designing the bolted connection. (AISC had equation 1.10-4 to give a shear flow for the connection.)
I also wondered if I had to stagger the bolt pattern or can I provide a uniform pattern of two parallel rows of bolts?
I would appreciate any help offfered.
I am bolting a WT stiffener to the web for the intermediate stiffeners, but I can't find anything in the AREMA code to give me a criteria for designing the bolted connection. (AISC had equation 1.10-4 to give a shear flow for the connection.)
I also wondered if I had to stagger the bolt pattern or can I provide a uniform pattern of two parallel rows of bolts?
I would appreciate any help offfered.