Considering a project where there will be a 55' deep excavation. The top 13' is fill material (125 pcf) that can be laid back at a 1.5:1 slope. The lower 42' will be a vertical face cut by blasting the rock and excavating in lifts. The general shape of the excavation is square. Recovery on the rock is 85% to 100% and RQD ranges from 37% to 80%. Water table is about 7' below grade.

k=k(a)=0.33
k=k(o)=0.5

A crane will sit at the top of the excavation, so a 250 PSF surcharge should be assumed.

What is the best method to determine the spacing of rock bolts/anchors for this situation?

Thanks.
 