foley7
Civil/Environmental
- Feb 3, 2011
- 6
I have a client that wants to overlay and raise the existing asphalt roadway 2 inches. The road was surveyed and the cross slopes vary and roadway profile grades have allot of unnecessary grade breaks. The road meets minimum standards. I think if you're going to spend the money you should make the cross slopes match and smooth out the profile grade by leveling and milling instead of just laying over the existing grades???? Any thoughts??