cadfreak
Mechanical
- Dec 22, 2005
- 42
When you have a multi-sheet drawing, what is the Drafting Standard for the Zone Callout when you have changes on sheet 3 of 5? Would it be P3-C2?
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.