parris
Electrical
- Jun 24, 2005
- 2
Seeking suggestions on the type and method of replacing existing X bracing to allow design/construction under a vaulted structure.
A 1987 72' L x 46' W x 25' H single-story structure sits atop 27 5"x5"x3/16" steel tube columns and a 6'x14'6"x8" concrete block wall. 18 of the columns and 6 feet of block wall are perimeter. The block wall primarily supports a 22' high rocked wall inside the structure. Each column is bolted through a 10"x10"x5/8" baseplate to an independent footing at a different elevation on a 2D-sloping hillside (i.e. South columns range from 10" to 14', North columns range from 13' to 23'). Columns and three places on the conrete block wall are joined by glu-lam woods beams. The structure is adjoined on the North to a vaulted stair/tram enclosure traversing 50 vertical feet to a ground-level entry.
Existing X bracing comprises 2.5"x2.5"x3/16" angle iron welded to 3/8" steel plate welded to column centers. There are five sets of X bracing between perimeter-interior columns and nine sets of X bracing between perimeter columns.
The existing bracing and its method of attachment interfere with the design and attachment of new beams and walls to enclose the space under the existing structure. The walls could be located between columns or just inside columns but for the X bracing config. New beam pockets could be welded at the base of each column but for the X bracing config. At least some and perhaps nearly all of the replacement bracing may be visible through windows so an architecturally appealing style of bracing is desirable. Because of the 2D sloping hill, in order to reasonably maximize enclosed volume, new beams must make vertical jogs.
Welding nine sets of new X bracing to the exterior of perimeter columns before removing the nine sets of existing X bracing is the most obvious thought, except that avoiding/minimizing visible bracing is preferred. Could the wind loads be transferred to the footings or sufficiently absorbed by simply tying the columns together by new beams, trusses, wall sections, etc.? With respect to the design, variable temps on interior and exterior steel could be a concern (could be 20 below outside and 75 inside).
Grateful to receive any suggestions.
A 1987 72' L x 46' W x 25' H single-story structure sits atop 27 5"x5"x3/16" steel tube columns and a 6'x14'6"x8" concrete block wall. 18 of the columns and 6 feet of block wall are perimeter. The block wall primarily supports a 22' high rocked wall inside the structure. Each column is bolted through a 10"x10"x5/8" baseplate to an independent footing at a different elevation on a 2D-sloping hillside (i.e. South columns range from 10" to 14', North columns range from 13' to 23'). Columns and three places on the conrete block wall are joined by glu-lam woods beams. The structure is adjoined on the North to a vaulted stair/tram enclosure traversing 50 vertical feet to a ground-level entry.
Existing X bracing comprises 2.5"x2.5"x3/16" angle iron welded to 3/8" steel plate welded to column centers. There are five sets of X bracing between perimeter-interior columns and nine sets of X bracing between perimeter columns.
The existing bracing and its method of attachment interfere with the design and attachment of new beams and walls to enclose the space under the existing structure. The walls could be located between columns or just inside columns but for the X bracing config. New beam pockets could be welded at the base of each column but for the X bracing config. At least some and perhaps nearly all of the replacement bracing may be visible through windows so an architecturally appealing style of bracing is desirable. Because of the 2D sloping hill, in order to reasonably maximize enclosed volume, new beams must make vertical jogs.
Welding nine sets of new X bracing to the exterior of perimeter columns before removing the nine sets of existing X bracing is the most obvious thought, except that avoiding/minimizing visible bracing is preferred. Could the wind loads be transferred to the footings or sufficiently absorbed by simply tying the columns together by new beams, trusses, wall sections, etc.? With respect to the design, variable temps on interior and exterior steel could be a concern (could be 20 below outside and 75 inside).
Grateful to receive any suggestions.