Miner99er
Structural
- Jan 3, 2006
- 11
My issue is that I have an open web joist (LH series) that is over stressed about 10%. I believe I have two options at this point.
A. I can "cover plate" the existing joist.
B. try to spread the RTU weight over additional joists by "x-bridging" between additional joist. I think this would be the preferred option but I'm a little unsure how much "help" I can get from the additional joists.
If anyone has any insight to this issue I would greatly appreciated it.
A. I can "cover plate" the existing joist.
B. try to spread the RTU weight over additional joists by "x-bridging" between additional joist. I think this would be the preferred option but I'm a little unsure how much "help" I can get from the additional joists.
If anyone has any insight to this issue I would greatly appreciated it.