shadow
Computer
- Mar 1, 2001
- 321
ok here is what im trying to do
points a,b,c,d,e, & F starting a baseline diminsion from a to b and using the Extension line coming off of as a ref line (actually the word ref is written offset from the extention line) so we'll call that extention line A. so now we diminsion from A to B then when we get to A to C the dim lines are on top of each other and the txt representing the length is actuall between B & C but because of the REF on the ext line A the shop knows that ext line A is the ref line
now has anyone come across a lsp or other routine that does this using associative dims with out a bunch of steps ie having to edit each dim so that the dim lines are ontop of one another
Thanks
if everyone helps everybody the world will be a better place
points a,b,c,d,e, & F starting a baseline diminsion from a to b and using the Extension line coming off of as a ref line (actually the word ref is written offset from the extention line) so we'll call that extention line A. so now we diminsion from A to B then when we get to A to C the dim lines are on top of each other and the txt representing the length is actuall between B & C but because of the REF on the ext line A the shop knows that ext line A is the ref line
now has anyone come across a lsp or other routine that does this using associative dims with out a bunch of steps ie having to edit each dim so that the dim lines are ontop of one another
Thanks
if everyone helps everybody the world will be a better place