CWEngineer
Civil/Environmental
- Jul 3, 2002
- 269
Do you guys see any issue with placing different types of materials along the profile of an RCP or is this acceptable? For example placing a slurry (unit weight of concrete of 150 pcf) for certain length of the pipe, then placing soil with 139 pcf for the remaining length of the RCP?
Thanks
Thanks