Prestressed Guy
Structural
- May 11, 2007
- 390
Structure is in SDC - 3.
I am working on the conceptual design of a structure to house some industrial mechanical equipment.
The structure consists single elevated level of a Special Ranforced Concrete Moment Frame podium which will support a large mass of mechanical equipment and its enclosure. The columns would be designed as fixed top and bottom. The podium will have large mechanical units bolted to the floor wich will be structural steel with a composite concrete floor. For the podium, R = 8.
The enclosure for the equipment will be insulated precast concrete wall panels with a roof consisting of steel beams and corrugated metal deck. This enclosure would be detailed as an Intermediate Precast Shear Wall system which would have an r = 4.
If it were a building structure per 12.2.3 the R for the podium would be 4.
I am looking at this more as a Chapter 15 non-building structure per table 15-4-1. My thinking is that this is a chapter 15 structural podium. If that podium had a large, heavy piece of equipment housed in a weatherproof box the size of the podium it would still be designed as a SRCMF type structure with R = 8.
My understanding is that the provisions of 12.2.3.1 are more intended for a multi-story structure which has a soft story at the lowest level and this structure doesn’t really fit into that box. My understanding of 12.2.3 is to account for the dynamic response of the stiffer upper building but at least in the long direction, this upper structure will act like a rigid box. It might be that it would be better to use the lower R = 4 for the precast walls for the transverse direction.
I am working on the conceptual design of a structure to house some industrial mechanical equipment.
The structure consists single elevated level of a Special Ranforced Concrete Moment Frame podium which will support a large mass of mechanical equipment and its enclosure. The columns would be designed as fixed top and bottom. The podium will have large mechanical units bolted to the floor wich will be structural steel with a composite concrete floor. For the podium, R = 8.
The enclosure for the equipment will be insulated precast concrete wall panels with a roof consisting of steel beams and corrugated metal deck. This enclosure would be detailed as an Intermediate Precast Shear Wall system which would have an r = 4.
If it were a building structure per 12.2.3 the R for the podium would be 4.
I am looking at this more as a Chapter 15 non-building structure per table 15-4-1. My thinking is that this is a chapter 15 structural podium. If that podium had a large, heavy piece of equipment housed in a weatherproof box the size of the podium it would still be designed as a SRCMF type structure with R = 8.
My understanding is that the provisions of 12.2.3.1 are more intended for a multi-story structure which has a soft story at the lowest level and this structure doesn’t really fit into that box. My understanding of 12.2.3 is to account for the dynamic response of the stiffer upper building but at least in the long direction, this upper structure will act like a rigid box. It might be that it would be better to use the lower R = 4 for the precast walls for the transverse direction.