Berenger
Chemical
- Jun 10, 2012
- 51
Hi experts,
I have a few questions about PSV sizing. I got some drawings and datasheets from a vendor for a fuel gas skid and I don't think the vendor calculations are correct. I will appreciate if you can help me with answers to the following questions:
(1) Fuel gas skid is designed for a maximum flowrate of 2 mmscfd BUT the actual usage is 0.5 MMscfd. Do you size PSVs based on 2 mmscfd figure OR 0.5 mmscfd figure? Keeping in mind that usage might increase due to possible plant expansion.
(2) When sizing PSV for the fuel gas scrubber, do you size based on flowrate OR do you size based on scrubber volume?
I have always sized PSVs based on actual flowrate to prevent oversizing and/or compromising integrity of the valve (e.g. chattering)
You inputs are welcomed and appreciated.
Berenger.
I have a few questions about PSV sizing. I got some drawings and datasheets from a vendor for a fuel gas skid and I don't think the vendor calculations are correct. I will appreciate if you can help me with answers to the following questions:
(1) Fuel gas skid is designed for a maximum flowrate of 2 mmscfd BUT the actual usage is 0.5 MMscfd. Do you size PSVs based on 2 mmscfd figure OR 0.5 mmscfd figure? Keeping in mind that usage might increase due to possible plant expansion.
(2) When sizing PSV for the fuel gas scrubber, do you size based on flowrate OR do you size based on scrubber volume?
I have always sized PSVs based on actual flowrate to prevent oversizing and/or compromising integrity of the valve (e.g. chattering)
You inputs are welcomed and appreciated.
Berenger.