I used a French method in order to take into account the oversized aggregates greater than 20 mm . The material is a composed of gravel and sand 0/40 mm . The calculated modified proctor dry density is 2.14 t/m3 and after the correction the dry density is 2.45 t/m3. My question is the corrected value reasonable ?
I used a French method in order to take into account the oversized aggregates greater than 20 mm . The material is a composed of gravel and sand 0/40 mm . The calculated modified proctor dry density is 2.14 t/m3 and after the correction the dry density is 2.45 t/m3. My question is the corrected value reasonable ?