I have 4 nr. large medium temperature hot water boilers in parallel with the pumps retrofitted to run in primary/secondary configuration . Each boiler has a pump and all boilers are connected on a main header. Each pump is served from a return header. At the end of the header we go into the secondary pumps. All pretty normaly arrangement.
I now need to add the decoupling line. Do I need the tie-in points for the decoupling line at the end of the header nearest the secondard pumps and the last boiler (just like in all the text books) or can I put it up the other end of the header (far away from the secondard pumps) at the start of the first boiler...this is my prefered option due to the availablilty of valved tie in points left vacent from a redundant and stripped out boiler....
You help would be much appriciated...
I now need to add the decoupling line. Do I need the tie-in points for the decoupling line at the end of the header nearest the secondard pumps and the last boiler (just like in all the text books) or can I put it up the other end of the header (far away from the secondard pumps) at the start of the first boiler...this is my prefered option due to the availablilty of valved tie in points left vacent from a redundant and stripped out boiler....
You help would be much appriciated...