mojak
Mechanical
- Feb 10, 2009
- 2
One of our client requirement is to give allowance in the design to pre-tension the anchor bolt by 75% of the allowable tensile stress. This requirement was given after they have stated allowable stress (tension and shear) of SA307- B / SA193-B7 bolts.
I have some difficulty understanding this since I am quite new on this work. Does this have something to do with initial preload in bolts (both PV Elite and Compress has option in basering design with regards to initial bolt preload percentage). Or does this mean that i have to use only 75% of allowable tensile strength in determining the size of my anchor bolt.
I would appreciate your help on this. Thank you very much.
I have some difficulty understanding this since I am quite new on this work. Does this have something to do with initial preload in bolts (both PV Elite and Compress has option in basering design with regards to initial bolt preload percentage). Or does this mean that i have to use only 75% of allowable tensile strength in determining the size of my anchor bolt.
I would appreciate your help on this. Thank you very much.