I currently have an system that moves air and dust that is rated at 5000 m3/hr and the pressure drop through the sysem is measured at 20 m/barg.
I need to extend the system so that 5 of the 'units' above all operate in parrallel, all tying together just before a new fan that I need to specify.
Am I correct in thinking that the pressure drop through each system should be added together or not? ie the new fan would be rated at 2500 m3/hr(5x5000) and pressure drop 100 mbarg (5x20). I know I will need to add on a little for the ductwork after all 4 units combined at the high flowrate, but I am ignoring this for now.
I need to extend the system so that 5 of the 'units' above all operate in parrallel, all tying together just before a new fan that I need to specify.
Am I correct in thinking that the pressure drop through each system should be added together or not? ie the new fan would be rated at 2500 m3/hr(5x5000) and pressure drop 100 mbarg (5x20). I know I will need to add on a little for the ductwork after all 4 units combined at the high flowrate, but I am ignoring this for now.