Rob100
Mechanical
- Aug 2, 2005
- 16
We have a developer that built an embankment that has failed. Near this embankment, we have a buried 48" pipeline. The line is welded steel carrying municipal water. The question I have been asked is when will the pipe fail due to erosion. I have performed a simple beam analysis using the weight of the pipe and water. The pipeline is in a hillside that is quickly eroding away. What is the best approach to estimating how much soil can erode away? I'm not sure what impact deflection of the pipe will have on failure. This is obviously an emergency so there is no time to do ASME analysis of the piping. Does anyone have a quick a dirty hand calc to approx this?