sgoel
Chemical
- Sep 17, 2000
- 32
Hello everyone
We are installing a pilot operated relief valve on a process line. This relief valve is downstream of a bursting disk (bd). We are debating if the location of the pilot inlet should be downstream of bd or from the main process line.
Request your kind input please.
Thanking you in anticipation please.
Shashank
India
We are installing a pilot operated relief valve on a process line. This relief valve is downstream of a bursting disk (bd). We are debating if the location of the pilot inlet should be downstream of bd or from the main process line.
Request your kind input please.
Thanking you in anticipation please.
Shashank
India