boffintech
Civil/Environmental
- Jul 29, 2005
- 469
Have a pervious concrete pavement job and the specs require that the void ratio be determined. Not sure of my formula. What do you think?
core length = 5 7/8"
core dia. = 3.74
A = wt in air = 2128g
B = SSD wt. = 2177.2g
C = wt in water = 1250.1g
BSG = A/(B-C) = 2.295
job mix formula density = 117.21
% compaction = 143.2 lbs/ft3
% air voids = 2.2%
The 2.2% air voids doesn't seem reasonable and my compaction is way over.
core length = 5 7/8"
core dia. = 3.74
A = wt in air = 2128g
B = SSD wt. = 2177.2g
C = wt in water = 1250.1g
BSG = A/(B-C) = 2.295
job mix formula density = 117.21
% compaction = 143.2 lbs/ft3
% air voids = 2.2%
The 2.2% air voids doesn't seem reasonable and my compaction is way over.