Parkerlax
Geotechnical
- Jan 20, 2007
- 5
I'm recommending a Fire Lane pavement design section for a client who has provided a design load of 35 tons minimum. The soils should there should have a minimum CBR value of 4.What should the minimum ESALs be for a Fire Lane? Do all fire trucks have the same number of wheel(axles)? The client does not have a traffic count for the site. Thanks