ChangeOrder
Structural
- Mar 26, 2022
- 13
I am leaving a 2’-0”x 6’-0” opening in a foundation for conduit stub ups. These will not be encased in a ductbank, but in individual tubes coming up. How are the openings filled in after conduits are placed? Thank you.