bfuchs
Electrical
- Feb 2, 2000
- 36
If you needed to choose, which solution would you go for :<br> - install 2x120mm² cable per phase<br> - install 1x240mm² cable per phase<br><br>We assume of course that both are possible. (2 separate 120s can carry more than 1 240, but we'll assume here that a mutual derating brings the current carrying capacity down to the same level).<br><br>My opinion is that the 120mm² is easier to install and work with(bending radius, bolting to breaker terminals, etc...) but I am sometimes uneasy having multiple conductors in parallel.<br><br>What parameters would influence your final choice (including cable cost, installation cost, risks, maintenance, ...) ?