A modification is suggested by operations to modify a High Pressure Steam piping to install a new type inline type desuperheater.
Operating pressure 870 PSIG and Temperature 950 degree F.The plant is 20 years old.
To do this modification,what are the critical things to consider?
DO we need to consider existing corrosion(wall thickness) in the line? Can stress analysis identify whether flange joints can be introduced in this line?
What are the codes to be considered in this modification?This is a stress relived line,so PWHT needed after welding?There is a suggestion of reducing the line diameter for a 3 meters for the effective working of desuperheater.
How all these to be considered in evaluation and planning stage?
DV