Tomfh
Structural
- Feb 27, 2005
- 3,591
What in your opinion is the maximum allowable crack width in a typical PT slab (say a post tensioned car park deck) before structural integrity may begin to be affected? I.e when is the shear and moment capacity across a crack starting to become compromised due to the gap? When does a shrinkage crack become a so called “structural crack”?
Are there any technical references for this?
Are there any technical references for this?