BauTomTom
Structural
- Jan 31, 2011
- 110
I was studying different codes and realized that the ration of Reinforcement area to concrete area varies very much from code to code.
What is actually the reason for? Why is it critical when you have to much steel in a column? What if you could still provide enough clearance between the bars, so that the concrete aggregates could still pass?
What if you would even use a concrete with smaller aggregate size?
How critical is it actually if you exceed the ration for example of 10% in the splicing areas?
Bau Tom Tom
What is actually the reason for? Why is it critical when you have to much steel in a column? What if you could still provide enough clearance between the bars, so that the concrete aggregates could still pass?
What if you would even use a concrete with smaller aggregate size?
How critical is it actually if you exceed the ration for example of 10% in the splicing areas?
Bau Tom Tom