kchadee
Structural
- Aug 27, 2012
- 4
BS 8110 limits the depth of lever arm to maximum 0.95 the effective depth. One reason i could find is because the top layer of concrete is usually of poor quality due to bleed water accumulating on top, therefore this limit on lever arm. Still having some doubts. Maybe someone can help