RLJ
Mechanical
- Jan 8, 2001
- 29
We have an electric overhead crane that was manufactured in 1892 using riveted girder construction. The maufacturer has recommended that it be taken out of service. I assume their reasoning is that the bridge has reached its fatigue cycle limits. In addition, we are aware that the steel will work harden over time becoming brittle. Does anyone have a method(s) to determine the integrity of the materials (rivets & steel) for this bridge?