We use to soak CBR sample in the mould normally for 4 days and check the swell before testing. Can anyone tell me what is the limit allowed for swell for construction of Road Sub Base soil?
A Sub Base sample collected from the road section ,which was damaged immediately after construction indicated a swell value of 6 mm after 4 day soaking. Normal soil in other sections indicated swell value below 2 mm. Has this 6 mm value caused for the damages. Please help me by giving the reasons.